Cable connections and network device ports in a telecommunications rack.

Implementation of a LAN/WiFi network

IT network deployment

We design and implement wired networks, Wi-Fi and connections between sites. We select devices, configure access and check that business applications work. You receive measurement results, documentation and configuration backups. The cutover plan includes agreed service interruptions.

Trusted by

Companies and institutions that need stable IT.

  • AdAc
  • Baseline
  • BTW
  • Charlie
  • Dako
  • EVO
  • FTH
  • IFJ
  • MAEM
  • Banki Spółdzielcze BPS
  • PJG
  • Spinel Trade
  • Suder
  • Ziko Apteka
  • Aforti
  • Base Finance
  • CADM
  • Consol
  • Deka Trans
  • Ferro
  • GATE
  • Igoria Trade
  • Magnet Audit
  • Novacura
  • Przetargi
  • Streamsoft
  • VUMO
  • Audytplus
  • BKB Kancelaria Prawna
  • CBT
  • Contimax
  • ERBET
  • FOMACH
  • Geotermia Podhalańska
  • LATIS
  • Metgal
  • PIBR
  • Spontex
  • Super Krak
  • Wolimex

A network designed around your business

We build networks for new sites, modernise existing ones and bring branch configurations into a consistent design. We start with users, critical applications, budget and growth plans. The design covers cabling, switches, wireless devices and internet connections. We define network zones, addressing and traffic routing, including address assignment (DHCP) and name resolution (DNS). We set traffic priorities for calls, video meetings and production systems. For connections between sites, we compare costs, support terms and application needs. We compare VPN tunnels over the internet, carrier MPLS links and SD-WAN. The assessment considers link quality and number, central management and application-based path selection; failover must be tested in the actual network.

Discuss your network project

ISO 27001 · TÜV NORD Polska

TÜV NORD Polska has certified Virtline’s information security management system to PN-EN ISO/IEC 27001:2023-08. The published certificate states its scope and validity.

View Virtline’s certificate

Discuss your network project

Network implementation process

Before making changes, we agree who approves them, how they will be accepted and how to return to the previous configuration.

01

Assessment

We review devices, ports, links, cabling, software versions and available documentation. We gather user problems and application, security and availability requirements.

02

Design and migration plan

We select the architecture and devices, prepare a cost estimate and plan the stages. We agree maintenance windows, user communications, configuration backups and rollback conditions.

03

Configuration and pilot

Where possible, we prepare devices outside the live network; otherwise, we introduce changes in stages. We configure connections, Wi-Fi, access zones and monitoring, then check critical services.

04

Acceptance and stabilisation

We complete the agreed tests, hand over documentation and train administrators. After go-live, we observe actual load, adjust settings and agree further reviews and the support model.

Discuss your network project

Practical scope

What you receive

Acceptance is based on agreed uses and criteria. We record results, limitations and decisions still needed.

01 Network design and map

Physical and logical diagrams, a device inventory, addressing, access zones and connection details. Selection accounts for capacity, licences, support lifecycle and room for growth, including power over network cables (PoE) for wireless access points, phones and cameras.

02 Tested wired and wireless access

Measurements of coverage, interference and performance for the expected number of devices. We check access-point placement, channels, roaming and the path to applications. Where included in the design, we also test backup links and traffic failover.

03 Access rules

Separate networks for employees, guests, servers and administrators. Permissions are limited to what each role needs. We agree access through company accounts and additional sign-in verification. We log VPN sessions and administrative actions. Tests cover firewall rules, VPN access and separation between zones. For corporate Wi-Fi, we agree encryption and authentication suited to the devices in use; the employee network should not allow open access without authentication.

04 Operations handover

As-built documentation, configuration backups with a tested restore, an administrative account list and change procedures. We train administrators and provide a follow-up plan with responsibilities and dates.

Discuss your network project

Production networks need separate planning

In factories and warehouses, we separate automation systems from office networks, guests and supplier access. We agree permitted connections, traffic observation without interfering with control systems and access through a designated administration point. Changes are planned with IT and plant maintenance teams. Integrating events with security analysis tools and an incident response team requires an agreed scope. Audit documentation for NIS2, DORA or ISO 27001 addresses requirements identified by the company; network implementation alone does not establish organisation-wide compliance.

Network implementation questions

Do you handle structured cabling?

+

We can design routes, outlets, panels and racks and coordinate delivery. Before quoting we identify who installs and measures the cabling, their competence and the records they will supply. Cabling type, PoE, as-built documentation and acceptance criteria depend on the project.

Will the implementation interrupt work?

+

Some changes require downtime. We divide migration into stages and agree maintenance windows, tests of critical applications and rollback conditions. Configuration backups are prepared before cutover. Possible downtime is assessed for the specific network; we do not promise an interruption-free implementation.

Does every device need replacing?

+

No. Modernisation starts with an assessment of the existing network and its limitations. Configuration changes, removing bottlenecks or improving Wi-Fi may not require replacing the whole environment. We compare manufacturers’ devices by compatibility, capacity, licences, support lifecycle and team skills. No single model or Wi-Fi standard is a permanent recommendation for every company.

What support is available after implementation?

+

We can agree monitoring, device software updates, configuration backups, support requests and access and capacity reviews. The plan also covers failover and configuration restore tests. The stabilisation schedule, reports, responsibilities and response times are set out in the contract; implementation does not automatically include them.

Plan your network implementation

Tell us the number of sites and users, critical applications, existing devices and network problems. Include suitable times for the work and who will maintain the environment.

Discuss your network project